Squadron Nostalgia LLC USS Maryland SSBN-738 Submarine Model,Navy,Scale Model,Mahogany,20 inch, Ohio Class
Squadron Nostalgia LLC USS Maryland SSBN-738 Submarine Model,Navy,Scale Model,Mahogany,20 inch, Ohio Class
Squadron Nostalgia LLC USS Maryland SSBN-738 Submarine Model,Navy,Scale Model,Mahogany,20 inch, Ohio Class
Squadron Nostalgia LLC USS Maryland SSBN-738 Submarine Model,Navy,Scale Model,Mahogany,20 inch, Ohio Class
Squadron Nostalgia LLC USS Maryland SSBN-738 Submarine Model,Navy,Scale Model,Mahogany,20 inch, Ohio Class
  • Load image into Gallery viewer, Squadron Nostalgia LLC USS Maryland SSBN-738 Submarine Model,Navy,Scale Model,Mahogany,20 inch, Ohio Class
  • Load image into Gallery viewer, Squadron Nostalgia LLC USS Maryland SSBN-738 Submarine Model,Navy,Scale Model,Mahogany,20 inch, Ohio Class
  • Load image into Gallery viewer, Squadron Nostalgia LLC USS Maryland SSBN-738 Submarine Model,Navy,Scale Model,Mahogany,20 inch, Ohio Class
  • Load image into Gallery viewer, Squadron Nostalgia LLC USS Maryland SSBN-738 Submarine Model,Navy,Scale Model,Mahogany,20 inch, Ohio Class
  • Load image into Gallery viewer, Squadron Nostalgia LLC USS Maryland SSBN-738 Submarine Model,Navy,Scale Model,Mahogany,20 inch, Ohio Class

Squadron Nostalgia LLC USS Maryland SSBN-738 Submarine Model,Navy,Scale Model,Mahogany,20 inch, Ohio Class

Regular price
$459.99
Sale price
$459.99
Regular price
$459.99
Sold out
Unit price
per 
Shipping calculated at checkout.
Click Here to Order on Amazon

Brand: Squadron Nostalgia LLC

Color: black

Features:

  • Handcrafted Kiln Dried Mahogany Model
  • US Veteran Owned Small Business
  • Large Scale Model
  • Heirloom Piece
  • 20 inch Model

Part Number: 840231541275

Details: USS Maryland SSBN-738 Submarine Model
Sail again with the crew of the USS Maryland SSBN-738 in this handcrafted wooden submarine model. Each piece is carved from wood and handpainted to provide a piece you’ll love.
Length – 20 inch
Maryland departed Groton for Kings Bay on 15 June 1992 and immediately started preparation for strategic certification, with the Blue crew achieving a successful test launch on 29 Jul 1992, and starting Trident D-5 missile Demonstration and Shakedown Operations (DASO) on 7 July 1992.[6]
The first exchange of command occurred on 4 September 1992, with the Gold crew taking charge of Maryland, and completing their phase of DASO on 22 October 1992. Various other inspections and training exercises were conducted throughout 1992.[6]
The Blue crew relieved the Gold crew 26 January 1993 and continued with preparations for strategic certification. Maryland returned to Groton on 30 January 1993 for post-shakedown maintenance prior to assuming responsibility for strategic deterrent patrols. Maryland returned to Kings Bay, Georgia on 9 April 1993.
Maryland completed various weapons and tactical certifications and then returned to Kings Bay on 4 May 1993 to join Submarine Squadron 20 and commence preparations for the first strategic deterrent patrol. The initial loadout of Trident D-5 missiles was completed at this point.
The Gold crew relieved the Blue crew 7 May 1993 and continued the refit. On 19 June 1993 Maryland went underway on her first strategic deterrent patrol, which started her strategic patrol cycle.